Production data review — synthetic demo plant
Injection moulding, 4 machines, 8 products, 2026-08-03 to 2026-08-30. Three exports as the plant keeps them; every number below traces to a check or a formula on this page.
Summary
Reported good output (spreadsheet)
2,819,124
after checks 2,920,686 · ERP confirmed 2,949,353 · trusted 2,863,539
Scrap rate (pieces)
4.9%
top defects: Flash 33%, Short shot 33%
Downtime per shift-hour
3.1 min
largest class: Changeover 3,905 min of 8,230
1. Data received
File
Owner
Rows
Period
Notes
shift_log.csv
Operators (spreadsheet)
334
2026-08-03 – 2026-08-30
date dd/mm/yyyy; product as code or name; downtime free text
erp_scrap.csv
ERP quality module
682
2026-08-03 – 2026-08-30
scrap in kg; defect codes
erp_output.csv
ERP production module
112
2026-08-03 – 2026-08-30
confirmed good quantity per work order
products.csv, machines.csv, shift_calendar.csv
Client masters
8
—
cavities, cycle time, part weight and its last update
Findings
Each check runs in this order on the raw files. Counts are rows unless stated.
Check
Count
Examples
What was done
parse_dates[shift_log]
119
03/08/2026; 03/08/2026; 03/08/2026
shift_log: format detected as dmy. 119 rows are ambiguous on their own (day and month both <= 12) and were resolved with the file-level format.
parse_dates[erp_scrap]
0
—
erp_scrap: format detected as iso. 0 rows are ambiguous on their own (day and month both <= 12) and were resolved with the file-level format.
map_products
106
—
106 rows named the product instead of the part number; mapped through the product master. 0 rows could not be mapped.
dedupe
4
2026-08-07 / A / IM-02 / P-1001; 2026-08-19 / C / IM-01 / P-1008; 2026-08-20 / B / IM-01 / P-1008
Exact duplicate shift rows dropped; first occurrence kept.
coverage
6
2026-08-08 / C / IM-03; 2026-08-09 / C / IM-04; 2026-08-15 / C / IM-04
Planned shifts with no spreadsheet row. Output for these shifts exists only in ERP.
unit_convert
2
P-1003; P-1006
ERP scrap is recorded in kg; converted to pieces with the product weight master. Listed products have a master weight older than 12 months, so their piece counts are approximate.
plausibility
21
2026-08-10 A IM-02 ratio 0.12; 2026-08-10 B IM-02 ratio 0.14; 2026-08-10 C IM-02 ratio 0.14
Reported pieces vs theoretical (run minutes x 60 / cycle x cavities). Rows below 0.5 look like shot counts, not pieces; corrected by the cavity count and marked as estimates.
normalize_downtime
13
cleaning; cleaning; cleaning
Free-text downtime reasons mapped to five classes by keyword; listed texts fell into 'other'.
cross_source
17
WO-260018 +3325; WO-260023 -2998; WO-260028 -3425
Work orders where spreadsheet and ERP output differ before correction; the reason label says which earlier check explains the gap.
2. Scrap
Scrap rate = scrap pieces / (good pieces + scrap pieces), spreadsheet rows after checks. Pareto uses ERP defect codes with kg converted to pieces.
Scrap rate by machine and product, highest first.
Defect Pareto, pieces per defect code with cumulative share.
Table: scrap by machine and product
Machine
Product
Good
Scrap
Rate
IM-01
P-1006 Clip
1,170,768
77,904
6.2%
IM-01
P-1003 Cap 20mm
427,535
23,729
5.3%
IM-01
P-1008 Spacer
288,117
12,587
4.2%
IM-02
P-1004 Cap 28mm
412,517
17,270
4.0%
IM-04
P-1007 Lid
89,845
3,371
3.6%
IM-03
P-1002 Housing B
121,758
4,542
3.6%
IM-04
P-1002 Housing B
89,101
3,067
3.3%
IM-02
P-1007 Lid
108,883
3,546
3.2%
IM-02
P-1001 Housing A
77,681
2,340
2.9%
IM-04
P-1001 Housing A
91,633
2,559
2.7%
IM-03
P-1005 Bracket
42,848
982
2.2%
Table: defect Pareto
Code
Defect
Pieces
Share
Cumulative
FL
Flash
53,470
33.1%
33.1%
SS
Short shot
53,058
32.8%
65.9%
SK
Sink mark
21,934
13.6%
79.5%
BL
Black specks
13,306
8.2%
87.7%
DM
Dimensional
9,991
6.2%
93.9%
CT
Contamination
9,912
6.1%
100.0%
3. Downtime
Minutes from the shift spreadsheet only (ERP has no downtime). Free-text reasons mapped to five classes; unmapped text is 'Other'.
ChangeoverBreakdownMaterialQuality holdOther
Downtime minutes by machine and class.
Class
Minutes
Share
Changeover
3,905
47.4%
Breakdown
1,820
22.1%
Material
1,360
16.5%
Quality hold
715
8.7%
Other
430
5.2%
Table: downtime by machine and class
Machine
Changeover
Breakdown
Material
Quality hold
Other
Total
IM-01
880
540
320
285
50
2,075
IM-02
1,015
390
210
170
255
2,040
IM-03
1,135
260
555
110
15
2,075
IM-04
875
630
275
150
110
2,040
4. Output reconciliation
112 work orders. Spreadsheet total before checks 2,819,124, after checks 2,920,686, ERP confirmed 2,949,353. 106 work orders agree within 2% after checks; their ERP total, 2,863,539, is the trusted figure.
Work orders by reconciliation result.
Work order
Date
Machine
Product
Sheet raw
Sheet after checks
ERP
Diff after
Reason
WO-260016
2026-08-06
IM-04
P-1002
9,557
9,557
9,557
+0
late_entry
WO-260018
2026-08-07
IM-02
P-1001
12,827
9,502
9,502
+0
duplicate
WO-260023
2026-08-08
IM-03
P-1002
5,685
5,685
8,683
-2,998
missing_shift
WO-260028
2026-08-09
IM-04
P-1001
6,649
6,649
10,074
-3,425
missing_shift
WO-260030
2026-08-10
IM-02
P-1004
5,376
43,008
43,019
-11
shot_error
WO-260034
2026-08-11
IM-02
P-1007
2,726
10,904
10,907
-3
shot_error
WO-260038
2026-08-12
IM-02
P-1007
2,801
11,204
11,208
-4
shot_error
WO-260042
2026-08-13
IM-02
P-1001
2,611
10,444
10,449
-5
shot_error
WO-260046
2026-08-14
IM-02
P-1001
2,331
9,324
9,330
-6
shot_error
WO-260050
2026-08-15
IM-02
P-1004
5,485
43,880
43,896
-16
shot_error
WO-260052
2026-08-15
IM-04
P-1001
6,780
6,780
10,031
-3,251
missing_shift
WO-260054
2026-08-16
IM-02
P-1004
4,904
39,232
39,242
-10
shot_error
WO-260065
2026-08-19
IM-01
P-1008
47,782
35,238
35,238
+0
duplicate
WO-260069
2026-08-20
IM-01
P-1008
45,305
34,703
34,703
+0
duplicate
WO-260076
2026-08-21
IM-04
P-1001
9,241
9,241
9,241
+0
late_entry
WO-260077
2026-08-22
IM-01
P-1003
29,852
29,852
44,831
-14,979
missing_shift
WO-260102
2026-08-28
IM-02
P-1004
51,267
37,538
37,538
+0
duplicate
WO-260108
2026-08-29
IM-04
P-1002
6,026
6,026
9,016
-2,990
missing_shift
WO-260111
2026-08-30
IM-03
P-1005
2,210
2,210
3,179
-969
missing_shift
Table: all work orders
Work order
Date
Machine
Sheet raw
Sheet after checks
ERP
Diff after
Reason
WO-260001
2026-08-03
IM-01
43,305
43,305
43,305
+0
agree
WO-260002
2026-08-03
IM-02
42,880
42,880
42,880
+0
agree
WO-260003
2026-08-03
IM-03
9,563
9,563
9,563
+0
agree
WO-260004
2026-08-03
IM-04
10,239
10,239
10,239
+0
agree
WO-260005
2026-08-04
IM-01
46,222
46,222
46,222
+0
agree
WO-260006
2026-08-04
IM-02
44,629
44,629
44,629
+0
agree
WO-260007
2026-08-04
IM-03
9,744
9,744
9,744
+0
agree
WO-260008
2026-08-04
IM-04
9,407
9,407
9,407
+0
agree
WO-260009
2026-08-05
IM-01
116,677
116,677
116,677
+0
agree
WO-260010
2026-08-05
IM-02
11,228
11,228
11,228
+0
agree
WO-260011
2026-08-05
IM-03
2,927
2,927
2,927
+0
agree
WO-260012
2026-08-05
IM-04
9,590
9,590
9,590
+0
agree
WO-260013
2026-08-06
IM-01
121,352
121,352
121,352
+0
agree
WO-260014
2026-08-06
IM-02
10,677
10,677
10,677
+0
agree
WO-260015
2026-08-06
IM-03
3,283
3,283
3,283
+0
agree
WO-260016
2026-08-06
IM-04
9,557
9,557
9,557
+0
late_entry
WO-260017
2026-08-07
IM-01
35,723
35,723
35,723
+0
agree
WO-260018
2026-08-07
IM-02
12,827
9,502
9,502
+0
duplicate
WO-260019
2026-08-07
IM-03
8,294
8,294
8,294
+0
agree
WO-260020
2026-08-07
IM-04
11,749
11,749
11,749
+0
agree
WO-260021
2026-08-08
IM-01
35,760
35,760
35,760
+0
agree
WO-260022
2026-08-08
IM-02
9,708
9,708
9,708
+0
agree
WO-260023
2026-08-08
IM-03
5,685
5,685
8,683
-2,998
missing_shift
WO-260024
2026-08-08
IM-04
11,351
11,351
11,351
+0
agree
WO-260025
2026-08-09
IM-01
42,415
42,415
42,415
+0
agree
WO-260026
2026-08-09
IM-02
40,375
40,375
40,375
+0
agree
WO-260027
2026-08-09
IM-03
3,038
3,038
3,038
+0
agree
WO-260028
2026-08-09
IM-04
6,649
6,649
10,074
-3,425
missing_shift
WO-260029
2026-08-10
IM-01
41,480
41,480
41,480
+0
agree
WO-260030
2026-08-10
IM-02
5,376
43,008
43,019
-11
shot_error
WO-260031
2026-08-10
IM-03
3,163
3,163
3,163
+0
agree
WO-260032
2026-08-10
IM-04
10,206
10,206
10,206
+0
agree
WO-260033
2026-08-11
IM-01
120,526
120,526
120,526
+0
agree
WO-260034
2026-08-11
IM-02
2,726
10,904
10,907
-3
shot_error
WO-260035
2026-08-11
IM-03
9,318
9,318
9,318
+0
agree
WO-260036
2026-08-11
IM-04
9,019
9,019
9,019
+0
agree
WO-260037
2026-08-12
IM-01
123,549
123,549
123,549
+0
agree
WO-260038
2026-08-12
IM-02
2,801
11,204
11,208
-4
shot_error
WO-260039
2026-08-12
IM-03
8,860
8,860
8,860
+0
agree
WO-260040
2026-08-12
IM-04
8,500
8,500
8,500
+0
agree
WO-260041
2026-08-13
IM-01
37,478
37,478
37,478
+0
agree
WO-260042
2026-08-13
IM-02
2,611
10,444
10,449
-5
shot_error
WO-260043
2026-08-13
IM-03
3,053
3,053
3,053
+0
agree
WO-260044
2026-08-13
IM-04
11,723
11,723
11,723
+0
agree
WO-260045
2026-08-14
IM-01
36,138
36,138
36,138
+0
agree
WO-260046
2026-08-14
IM-02
2,331
9,324
9,330
-6
shot_error
WO-260047
2026-08-14
IM-03
3,179
3,179
3,179
+0
agree
WO-260048
2026-08-14
IM-04
10,332
10,332
10,332
+0
agree
WO-260049
2026-08-15
IM-01
46,397
46,397
46,397
+0
agree
WO-260050
2026-08-15
IM-02
5,485
43,880
43,896
-16
shot_error
WO-260051
2026-08-15
IM-03
9,199
9,199
9,199
+0
agree
WO-260052
2026-08-15
IM-04
6,780
6,780
10,031
-3,251
missing_shift
WO-260053
2026-08-16
IM-01
45,570
45,570
45,570
+0
agree
WO-260054
2026-08-16
IM-02
4,904
39,232
39,242
-10
shot_error
WO-260055
2026-08-16
IM-03
8,721
8,721
8,721
+0
agree
WO-260056
2026-08-16
IM-04
10,121
10,121
10,121
+0
agree
WO-260057
2026-08-17
IM-01
115,603
115,603
115,603
+0
agree
WO-260058
2026-08-17
IM-02
10,456
10,456
10,456
+0
agree
WO-260059
2026-08-17
IM-03
3,267
3,267
3,267
+0
agree
WO-260060
2026-08-17
IM-04
8,642
8,642
8,642
+0
agree
WO-260061
2026-08-18
IM-01
105,028
105,028
105,028
+0
agree
WO-260062
2026-08-18
IM-02
10,811
10,811
10,811
+0
agree
WO-260063
2026-08-18
IM-03
3,046
3,046
3,046
+0
agree
WO-260064
2026-08-18
IM-04
9,095
9,095
9,095
+0
agree
WO-260065
2026-08-19
IM-01
47,782
35,238
35,238
+0
duplicate
WO-260066
2026-08-19
IM-02
10,266
10,266
10,266
+0
agree
WO-260067
2026-08-19
IM-03
8,969
8,969
8,969
+0
agree
WO-260068
2026-08-19
IM-04
11,412
11,412
11,412
+0
agree
WO-260069
2026-08-20
IM-01
45,305
34,703
34,703
+0
duplicate
WO-260070
2026-08-20
IM-02
8,941
8,941
8,941
+0
agree
WO-260071
2026-08-20
IM-03
8,647
8,647
8,647
+0
agree
WO-260072
2026-08-20
IM-04
11,309
11,309
11,309
+0
agree
WO-260073
2026-08-21
IM-01
45,106
45,106
45,106
+0
agree
WO-260074
2026-08-21
IM-02
38,482
38,482
38,482
+0
agree
WO-260075
2026-08-21
IM-03
3,266
3,266
3,266
+0
agree
WO-260076
2026-08-21
IM-04
9,241
9,241
9,241
+0
late_entry
WO-260077
2026-08-22
IM-01
29,852
29,852
44,831
-14,979
missing_shift
WO-260078
2026-08-22
IM-02
41,284
41,284
41,284
+0
agree
WO-260079
2026-08-22
IM-03
3,164
3,164
3,164
+0
agree
WO-260080
2026-08-22
IM-04
9,737
9,737
9,737
+0
agree
WO-260081
2026-08-23
IM-01
112,950
112,950
112,950
+0
agree
WO-260082
2026-08-23
IM-02
11,648
11,648
11,648
+0
agree
WO-260083
2026-08-23
IM-03
8,637
8,637
8,637
+0
agree
WO-260084
2026-08-23
IM-04
9,562
9,562
9,562
+0
agree
WO-260085
2026-08-24
IM-01
113,801
113,801
113,801
+0
agree
WO-260086
2026-08-24
IM-02
10,776
10,776
10,776
+0
agree
WO-260087
2026-08-24
IM-03
9,438
9,438
9,438
+0
agree
WO-260088
2026-08-24
IM-04
9,915
9,915
9,915
+0
agree
WO-260089
2026-08-25
IM-01
35,882
35,882
35,882
+0
agree
WO-260090
2026-08-25
IM-02
9,549
9,549
9,549
+0
agree
WO-260091
2026-08-25
IM-03
3,185
3,185
3,185
+0
agree
WO-260092
2026-08-25
IM-04
11,100
11,100
11,100
+0
agree
WO-260093
2026-08-26
IM-01
37,195
37,195
37,195
+0
agree
WO-260094
2026-08-26
IM-02
9,947
9,947
9,947
+0
agree
WO-260095
2026-08-26
IM-03
2,853
2,853
2,853
+0
agree
WO-260096
2026-08-26
IM-04
10,869
10,869
10,869
+0
agree
WO-260097
2026-08-27
IM-01
43,830
43,830
43,830
+0
agree
WO-260098
2026-08-27
IM-02
41,209
41,209
41,209
+0
agree
WO-260099
2026-08-27
IM-03
8,720
8,720
8,720
+0
agree
WO-260100
2026-08-27
IM-04
9,148
9,148
9,148
+0
agree
WO-260101
2026-08-28
IM-01
43,358
43,358
43,358
+0
agree
WO-260102
2026-08-28
IM-02
51,267
37,538
37,538
+0
duplicate
WO-260103
2026-08-28
IM-03
7,963
7,963
7,963
+0
agree
WO-260104
2026-08-28
IM-04
10,105
10,105
10,105
+0
agree
WO-260105
2026-08-29
IM-01
121,493
121,493
121,493
+0
agree
WO-260106
2026-08-29
IM-02
10,246
10,246
10,246
+0
agree
WO-260107
2026-08-29
IM-03
3,214
3,214
3,214
+0
agree
WO-260108
2026-08-29
IM-04
6,026
6,026
9,016
-2,990
missing_shift
WO-260109
2026-08-30
IM-01
119,789
119,789
119,789
+0
agree
WO-260110
2026-08-30
IM-02
10,933
10,933
10,933
+0
agree
WO-260111
2026-08-30
IM-03
2,210
2,210
3,179
-969
missing_shift
WO-260112
2026-08-30
IM-04
9,195
9,195
9,195
+0
agree
5. How the numbers were computed
Source-of-truth rules. Defect classification: ERP. Downtime: spreadsheet only. Output: ERP confirmed quantity, cross-checked against the corrected spreadsheet.
Dates. Format detected per file from rows where day > 12; ambiguous rows follow the file format.
Products. Names mapped to part numbers through the client product master; unmapped rows are listed, never guessed.
Duplicates. Same date, shift, machine and product: first row kept.
Coverage. Planned shift calendar × machines minus rows present.
Units. pieces = kg × 1000 / master weight (g). Master weights older than 12 months are flagged; their piece counts are approximate.
Plausibility. ratio = (produced + scrap) / (run minutes × 60 / cycle s × cavities). Below 0.5 is treated as a shot count and multiplied by cavities; above 1.1 is flagged. Corrected rows are estimates.
Downtime classes. Keyword dictionary (English and Turkish spellings); anything else is 'Other'.
Agreement. A work order agrees when |sheet after checks − ERP| ≤ 2% of ERP.
Scrap cross-check. Spreadsheet scrap 151,897 pcs vs ERP-derived 161,671 pcs (+9,774). 111,044 of the ERP pieces come from products with a stale weight master.
Limits. No cycle-time or cavity changes within the period are modelled; corrected rows are marked and should be confirmed by the plant; this report does not estimate cost or savings. Assumes one work order per machine per day, joined on date and machine; a plant that runs more than one work order per machine per day needs a work-order column in the shift log to join correctly.